6405/7-2 S

Exploration, wildcatJunked

Drilled by Aker BP ASA with Scarabeo 8, 12.06.2023 to 26.07.2023 (44 days), to 1 892,0 m.

Water depth1 108,0 m
Total depth1 892,0 m MD
Vertical depth1 888,4 m TVD
Bottom-hole temperature-
Max inclination9,6°
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud12.06.2023
Completed26.07.2023
OperatorAker BP ASA
Position64,2665 N, 5,2602 E

Formations

2 tops reported, measured depth in metres.

GroupsNordland Group, top 1 142,0 mNordland GpFormationsNaust Formation, top 1 187,0 mNaust Fm1 1421 5001 892

Temperature

Reported at total depth-

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6405/7-U-10,01 920,0--2023
6405/7-3 S0,01 984,050 °C1,302023
6405/7-U-20,51 177,0--2025
6405/7-U-30,52 108,0--2025
6405/7-40,52 982,0--2025
6405/7-16,64 300,0129 °C1,452003

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Surface casing30"1 205,036"1 208,0-
Open hole-1 892,026"1 892,0-

Mud weight

4 measurements, one dot each, 1,00 to 1,30 g/cm³ against measured depth, water.

1,01,11,21,305001 0001 5001 208,0 m: 1,03 g/cm³, Water1 813,0 m: 1,30 g/cm³, Water1 892,0 m: 1,30 g/cm³, Water1 980,0 m: 1,03 g/cm³, Water
Show on the mapOpen on FactPages ↗