Fields / 6405/7-2 S
6405/7-2 S
Exploration, wildcatJunked
Drilled by Aker BP ASA with Scarabeo 8, 12.06.2023 to 26.07.2023 (44 days), to 1 892,0 m.
Water depth1 108,0 m
Total depth1 892,0 m MD
Vertical depth1 888,4 m TVD
Bottom-hole temperature-
Max inclination9,6°
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud12.06.2023
Completed26.07.2023
OperatorAker BP ASA
Position64,2665 N, 5,2602 E
Formations
2 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6405/7-U-1 | 0,0 | 1 920,0 | - | - | 2023 |
| 6405/7-3 S | 0,0 | 1 984,0 | 50 °C | 1,30 | 2023 |
| 6405/7-U-2 | 0,5 | 1 177,0 | - | - | 2025 |
| 6405/7-U-3 | 0,5 | 2 108,0 | - | - | 2025 |
| 6405/7-4 | 0,5 | 2 982,0 | - | - | 2025 |
| 6405/7-1 | 6,6 | 4 300,0 | 129 °C | 1,45 | 2003 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Surface casing | 30" | 1 205,0 | 36" | 1 208,0 | - |
| Open hole | - | 1 892,0 | 26" | 1 892,0 | - |
Mud weight
4 measurements, one dot each, 1,00 to 1,30 g/cm³ against measured depth, water.