Fields / 6405/7-U-1
6405/7-U-1
Other, shallow gasPlugged
Drilled by Aker BP ASA with Scarabeo 8, 13.06.2023 to 14.06.2023 (1 days), to 1 920,0 m.
Water depth1 108,0 m
Total depth1 920,0 m MD
Vertical depth1 920,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,7 m
Formation at total depth-
RigScarabeo 8
Spud13.06.2023
Completed14.06.2023
OperatorAker BP ASA
Position64,2665 N, 5,2603 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6405/7-2 S | 0,0 | 1 892,0 | - | 1,30 | 2023 |
| 6405/7-3 S | 0,0 | 1 984,0 | 50 °C | 1,30 | 2023 |
| 6405/7-U-2 | 0,5 | 1 177,0 | - | - | 2025 |
| 6405/7-4 | 0,5 | 2 982,0 | - | - | 2025 |
| 6405/7-U-3 | 0,5 | 2 108,0 | - | - | 2025 |
| 6405/7-1 | 6,6 | 4 300,0 | 129 °C | 1,45 | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.