Fields / 6405/7-U-3
6405/7-U-3
Other, shallow gasPlugged
Drilled by Aker BP ASA with Scarabeo 8, 14.05.2025 to 15.05.2025 (1 days), to 2 108,0 m.
Water depth1 104,0 m
Total depth2 108,0 m MD
Vertical depth2 107,8 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud14.05.2025
Completed15.05.2025
OperatorAker BP ASA
Position64,2666 N, 5,2709 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6405/7-U-2 | 0,0 | 1 177,0 | - | - | 2025 |
| 6405/7-4 | 0,0 | 2 982,0 | - | - | 2025 |
| 6405/7-U-1 | 0,5 | 1 920,0 | - | - | 2023 |
| 6405/7-3 S | 0,5 | 1 984,0 | 50 °C | 1,30 | 2023 |
| 6405/7-2 S | 0,5 | 1 892,0 | - | 1,30 | 2023 |
| 6405/7-1 | 7,1 | 4 300,0 | 129 °C | 1,45 | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.