WellplannerNorwegian shelf well data

Fields / Tyrihans / 6407/1-A-2 BH

6407/1-A-2 BH

Development, productionProducingOil and gas

Drilled by Equinor Energy AS with Songa Encourage in Tyrihans, 21.11.2018 to 21.12.2018 (30 days), to 5 854,0 m.

Water depth288,1 m
Total depth5 854,0 m MD
Vertical depth3 692,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,2 m
Formation at total depth-
RigSonga Encourage
Spud21.11.2018
Completed21.12.2018
OperatorEquinor Energy AS
Position64,8890 N, 7,0713 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Tyrihans gradient37,2 °C/km
Estimated at total depth from the gradient129 °C

The gradient is the median of 4 released wells in Tyrihans with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/1-A-2 AY1H same well0,07 456,0--2013
6407/1-A-2 AY2H same well0,07 441,0--2013
6407/1-A-2 AY3H same well0,07 612,0--2013
6407/1-A-2 H same well0,04 829,0--2013
6407/1-A-3 AY1H0,06 979,0--2014
6407/1-A-3 AY2H0,07 309,0--2014
6407/1-A-3 AY3H0,07 600,0--2014
6407/1-A-3 BH0,05 332,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗