WellplannerNorwegian shelf well data

Fields / Tyrihans / 6407/1-A-2 H

6407/1-A-2 H

Development, observationPluggedOil

Drilled by Statoil Petroleum AS with Transocean Leader in Tyrihans, 06.01.2013 to 11.03.2013 (64 days), to 4 829,0 m.

Water depth288,1 m
Total depth4 829,0 m MD
Vertical depth3 759,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,5 m
Formation at total depth-
RigTransocean Leader
Spud06.01.2013
Completed11.03.2013
OperatorStatoil Petroleum AS
Position64,8890 N, 7,0713 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Tyrihans gradient37,2 °C/km
Estimated at total depth from the gradient132 °C

The gradient is the median of 4 released wells in Tyrihans with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/1-A-2 AY1H same well0,07 456,0--2013
6407/1-A-2 AY2H same well0,07 441,0--2013
6407/1-A-2 AY3H same well0,07 612,0--2013
6407/1-A-2 BH same well0,05 854,0--2018
6407/1-A-3 AY1H0,06 979,0--2014
6407/1-A-3 AY2H0,07 309,0--2014
6407/1-A-3 AY3H0,07 600,0--2014
6407/1-A-3 BH0,05 332,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗