Fields / 6407/1-U-2
6407/1-U-2
Other, shallow gasPlugged
Drilled by Equinor Energy AS with West Hercules, 23.09.2021 to 24.09.2021 (1 days), to 1 445,0 m.
Water depth301,0 m
Total depth1 445,0 m MD
Vertical depth1 445,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigWest Hercules
Spud23.09.2021
Completed24.09.2021
OperatorEquinor Energy AS
Position64,9793 N, 7,0484 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/1-9 | 0,0 | 3 914,0 | 136 °C | 1,72 | 2021 |
| 6407/1-U-1 | 0,0 | - | - | - | 2021 |
| 6407/1-5 S | 2,3 | 4 177,0 | 145 °C | 1,69 | 2012 |
| 6406/3-U-6 | 3,4 | 325,2 | - | - | 2014 |
| 6406/3-G-4 H | 3,4 | 7 424,0 | - | - | 2017 |
| 6406/3-G-1 H | 3,4 | 7 451,0 | - | - | 2017 |
| 6406/3-U-5 | 3,4 | 324,9 | - | - | 2014 |
| 6406/3-G-3 H | 3,4 | 4 512,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.