Fields / 6407/5-3 S
6407/5-3 S
Exploration, wildcatPlugged and abandonedGas and condensate
Drilled by Vår Energi ASA with COSLProspector, 10.08.2026 to 25.10.2026 (76 days), to 4 356,0 m.
Water depth218,0 m
Total depth4 356,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table26,1 m
Formation at total depth-
RigCOSLProspector
Spud10.08.2026
Completed25.10.2026
OperatorVår Energi ASA
Position64,6588 N, 7,4512 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/5-1 | 6,0 | 4 306,0 | 155 °C | 1,72 | 1987 |
| 6407/5-B-3 H | 10,2 | 2 537,0 | - | - | 2002 |
| 6407/5-B-1 H | 10,2 | 2 795,0 | - | - | 2020 |
| 6407/6-5 | 10,5 | 2 759,0 | 111 °C | 1,56 | 1999 |
| 6407/6-4 | 11,5 | 3 126,0 | 110 °C | 1,62 | 1990 |
| 6407/6-3 | 11,8 | 3 220,0 | 98 °C | 1,63 | 1986 |
| 6407/5-2 S | 11,9 | 3 545,0 | 133 °C | 1,57 | 2011 |
| 6407/6-2 | 12,0 | 524,0 | - | 1,08 | 1985 |
Casing and formation tests
No casing programme is reported for this wellbore.