WellplannerNorwegian shelf well data

Fields / Mikkel / 6407/5-B-1 H

6407/5-B-1 H

Development, productionProducingGas

Drilled by Equinor Energy AS with Transocean Norge in Mikkel, 06.09.2020 to 20.10.2020 (44 days), to 2 795,0 m.

Water depth228,0 m
Total depth2 795,0 m MD
Vertical depth2 511,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,9 m
Formation at total depth-
RigTransocean Norge
Spud06.09.2020
Completed20.10.2020
OperatorEquinor Energy AS
Position64,6471 N, 7,6637 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Mikkel gradient36,8 °C/km
Estimated at total depth from the gradient87 °C

The gradient is the median of 3 released wells in Mikkel with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/5-B-3 H0,02 537,0--2002
6407/6-50,52 759,0111 °C1,561999
6407/6-42,43 126,0110 °C1,621990
6407/6-26,8524,0-1,081985
6407/6-2 R6,8524,0--1986
6407/6-2 R26,8524,0--1986
6407/6-36,93 220,098 °C1,631986
6407/6-67,22 508,092 °C1,502008

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗