Fields / Njord / 6407/7-4
6407/7-4
Exploration, appraisalPlugged and abandonedOil
Drilled by Norsk Hydro Produksjon AS with Polar Pioneer in Njord, 13.01.1989 to 28.03.1989 (74 days), to 3 211,0 m in the Åre Formation.
Water depth329,0 m
Total depth3 211,0 m MD
Vertical depth3 204,0 m TVD
Bottom-hole temperature122 °C
Max inclination9,7°
Rotary table23,0 m
Formation at total depthÅre Formation
RigPolar Pioneer
Spud13.01.1989
Completed28.03.1989
OperatorNorsk Hydro Produksjon AS
Position64,2621 N, 7,2238 E
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 122 °C |
| Drill-stem test at 3 138,5 m | 119 °C |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 119 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6407/7-4 R same well | 0,0 | - | - | - | - |
| 6407/7-A-9 AH | 1,4 | 4 726,0 | - | - | 2005 |
| 6407/7-A-9 BH | 1,4 | 4 852,0 | - | - | 2006 |
| 6407/7-A-9 H | 1,4 | 6 602,0 | - | - | 2000 |
| 6407/7-A-8 AH | 1,4 | 5 278,0 | - | - | 2010 |
| 6407/7-A-8 H | 1,4 | 3 625,0 | - | - | 1996 |
| 6407/7-A-10 AH | 1,4 | 4 407,0 | - | - | 1997 |
| 6407/7-A-10 BY1H | 1,4 | 6 115,0 | - | - | 2002 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 440,0 | 36" | - | - |
| Intermediate | 20" | 524,0 | 26" | 541,0 | 1,41 LOT |
| Intermediate | 13 3/8" | 1 099,0 | 18 1/2" | 1 118,0 | 1,96 LOT |
| Intermediate | 9 5/8" | 2 790,0 | 12 1/4" | 2 812,0 | 1,60 LOT |
| Liner | 7" | 3 209,0 | 8 1/2" | 3 211,0 | - |
Mud weight
65 measurements, one dot each, 1,00 to 1,60 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 2 | 2 999,0 - 3 008,0 | 7,9 | - | 115 | 242 | 46 000 |
| 3 | 3 028,0 - 3 071,0 | 12,7 | - | 117 | 740 | 125 000 |
| 1 | 3 126,0 - 3 138,5 | 11,1 | - | 119 | - | 424 |