WellplannerNorwegian shelf well data

Fields / Njord / 6407/7-A-8 H

6407/7-A-8 H

Development, injectionPluggedGas

Drilled by Norsk Hydro Produksjon AS with West Vanguard in Njord, 28.11.1996 to 24.12.1996 (26 days), to 3 625,0 m.

Water depth330,0 m
Total depth3 625,0 m MD
Vertical depth2 743,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table22,0 m
Formation at total depth-
RigWest Vanguard
Spud28.11.1996
Completed24.12.1996
OperatorNorsk Hydro Produksjon AS
Position64,2709 N, 7,2024 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Njord gradient40,5 °C/km
Estimated at total depth from the gradient101 °C

The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/7-A-8 AH same well0,05 278,0--2010
6407/7-A-7 H0,03 880,0--1998
6407/7-A-9 AH0,04 726,0--2005
6407/7-A-9 BH0,04 852,0--2006
6407/7-A-9 H0,06 602,0--2000
6407/7-A-10 AH0,04 407,0--1997
6407/7-A-10 BY1H0,06 115,0--2002
6407/7-A-10 BY2H0,04 833,0--2003

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗