6407/7-A-7 H
Development, injectionProducingGas
Drilled by Norsk Hydro Produksjon AS with Njord in Njord, 15.02.1998 to 15.06.1998 (120 days), to 3 880,0 m.
Water depth330,0 m
Total depth3 880,0 m MD
Vertical depth3 014,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord
Spud15.02.1998
Completed15.06.1998
OperatorNorsk Hydro Produksjon AS
Position64,2709 N, 7,2022 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 111 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-A-6 AH | 0,0 | 3 920,0 | - | - | 2000 |
| 6407/7-A-6 H | 0,0 | 3 600,0 | - | - | 1998 |
| 6407/7-A-8 AH | 0,0 | 5 278,0 | - | - | 2010 |
| 6407/7-A-8 H | 0,0 | 3 625,0 | - | - | 1996 |
| 6407/7-A-5 AH | 0,0 | 3 507,0 | - | - | 2000 |
| 6407/7-A-5 BH | 0,0 | 4 247,0 | - | - | 2006 |
| 6407/7-A-5 CH | 0,0 | 4 872,0 | - | - | 2010 |
| 6407/7-A-5 H | 0,0 | 4 951,0 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.