Fields / Njord / 6407/7-A-6 AH
6407/7-A-6 AH
Development, injectionClosedGas
Drilled by Norsk Hydro Produksjon AS with Njord A in Njord, 06.05.2000 to 21.05.2000 (15 days), to 3 920,0 m.
Water depth330,0 m
Total depth3 920,0 m MD
Vertical depth2 795,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud06.05.2000
Completed21.05.2000
OperatorNorsk Hydro Produksjon AS
Position64,2708 N, 7,2020 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-A-6 H same well | 0,0 | 3 600,0 | - | - | 1998 |
| 6407/7-A-7 H | 0,0 | 3 880,0 | - | - | 1998 |
| 6407/7-A-5 AH | 0,0 | 3 507,0 | - | - | 2000 |
| 6407/7-A-5 BH | 0,0 | 4 247,0 | - | - | 2006 |
| 6407/7-A-5 CH | 0,0 | 4 872,0 | - | - | 2010 |
| 6407/7-A-5 H | 0,0 | 4 951,0 | - | - | 1999 |
| 6407/7-A-8 AH | 0,0 | 5 278,0 | - | - | 2010 |
| 6407/7-A-8 H | 0,0 | 3 625,0 | - | - | 1996 |
Casing and formation tests
No casing programme is reported for this wellbore.