WellplannerNorwegian shelf well data

Fields / Njord / 6407/7-A-16 H

6407/7-A-16 H

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Njord in Njord, 23.02.1998 to 07.10.1998 (226 days), to 4 418,0 m.

Water depth330,0 m
Total depth4 418,0 m MD
Vertical depth3 099,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord
Spud23.02.1998
Completed07.10.1998
OperatorNorsk Hydro Produksjon AS
Position64,2713 N, 7,2014 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Njord gradient40,5 °C/km
Estimated at total depth from the gradient115 °C

The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/7-A-20 AY1H0,0----
6407/7-A-20 AY2H0,0----
6407/7-A-20 H0,04 050,7--2013
6407/7-A-15 AH0,04 150,0--1996
6407/7-A-15 BH0,03 633,0--2005
6407/7-A-15 H0,04 122,0--1996
6407/7-A-17 H0,05 067,0--1998
6407/7-A-19 AH0,04 087,0--2009

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗