Fields / Njord / 6407/7-A-20 H
6407/7-A-20 H
Development, productionProducingOil and gas
Drilled by Statoil Petroleum AS with Njord A in Njord, 22.05.2013 to 02.11.2023 (3816 days), to 4 050,7 m.
Water depth330,0 m
Total depth4 050,7 m MD
Vertical depth2 921,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud22.05.2013
Completed02.11.2023
OperatorStatoil Petroleum AS
Position64,2714 N, 7,2015 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 108 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-A-20 AY1H same well | 0,0 | - | - | - | - |
| 6407/7-A-20 AY2H same well | 0,0 | - | - | - | - |
| 6407/7-A-16 H | 0,0 | 4 418,0 | - | - | 1998 |
| 6407/7-A-15 AH | 0,0 | 4 150,0 | - | - | 1996 |
| 6407/7-A-15 BH | 0,0 | 3 633,0 | - | - | 2005 |
| 6407/7-A-15 H | 0,0 | 4 122,0 | - | - | 1996 |
| 6407/7-A-19 AH | 0,0 | 4 087,0 | - | - | 2009 |
| 6407/7-A-19 H | 0,0 | 3 464,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.