Fields / 6407/7-U-1
6407/7-U-1
Other, shallow gasPlugged and abandoned
Drilled by StatoilHydro Petroleum AS with West Alpha, 16.06.2008 to 17.06.2008 (1 days).
Water depth293,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table18,0 m
Formation at total depth-
RigWest Alpha
Spud16.06.2008
Completed17.06.2008
OperatorStatoilHydro Petroleum AS
Position64,4304 N, 7,1273 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-8 | 0,0 | 5 138,0 | 185 °C | 1,72 | 2008 |
| 6407/7-8 A | 0,0 | 5 227,0 | - | 1,76 | 2008 |
| 6406/9-3 | 7,2 | 5 138,0 | 186 °C | 1,94 | 2013 |
| 6407/8-1 | 11,9 | 4 650,0 | 100 °C | 1,84 | 1992 |
| 6407/7-9 A | 12,7 | 4 960,0 | 155 °C | 1,64 | 2016 |
| 6407/7-9 S | 12,7 | 4 143,0 | 153 °C | 1,60 | 2016 |
| 6407/7-5 | 14,0 | 3 725,0 | 140 °C | 1,67 | 1990 |
Casing and formation tests
No casing programme is reported for this wellbore.