Fields / Hyme / 6407/8-C-2 AY2H
6407/8-C-2 AY2H
Development, productionProducingOil
Drilled by Statoil Petroleum AS with Scarabeo 5 in Hyme, 19.12.2012 to 07.01.2013 (19 days), to 3 551,0 m.
Water depth256,0 m
Total depth3 551,0 m MD
Vertical depth2 121,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud19.12.2012
Completed07.01.2013
OperatorStatoil Petroleum AS
Position64,3582 N, 7,5511 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Hyme report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/8-C-2 AY1H same well | 0,0 | 4 430,0 | - | - | 2012 |
| 6407/8-C-2 H same well | 0,0 | 3 520,0 | - | - | 2012 |
| 6407/8-C-4 H | 0,0 | 2 397,0 | - | - | 2012 |
| 6407/8-5 A | 1,1 | 3 231,0 | - | 1,18 | 2009 |
| 6407/8-5 S | 1,1 | 3 240,0 | 104 °C | 1,47 | 2009 |
| 6407/8-7 | 3,0 | 3 030,0 | - | 1,43 | 2015 |
| 6407/8-7 A | 3,0 | 3 178,0 | - | 1,47 | 2015 |
| 6407/8-6 | 4,3 | 3 420,0 | - | 1,51 | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.