WellplannerNorwegian shelf well data

Fields / Morvin / 6506/11-7

6506/11-7

Exploration, wildcatPlugged and abandonedOil and gas

Drilled by Den norske stats oljeselskap a.s with Scarabeo 5 in Morvin, 25.01.2001 to 27.07.2001 (183 days), to 4 977,5 m in the Åre Formation.

Water depth356,0 m
Total depth4 977,5 m MD
Vertical depth4 972,5 m TVD
Bottom-hole temperature175 °C
Max inclination6,0°
Rotary table25,0 m
Formation at total depthÅre Formation
RigScarabeo 5
Spud25.01.2001
Completed27.07.2001
OperatorDen norske stats oljeselskap a.s
Position65,1685 N, 6,4703 E

Formations

30 tops reported, measured depth in metres.

GroupsNordland Group, top 381,0 mNordland GpHordaland Group, top 1 905,0 mHordaland GpRogaland Group, top 2 132,0 mShetland Group, top 2 255,0 mShetland GpCromer Knoll Group, top 3 336,0 mCromer Knoll GpViking Group, top 4 575,5 mFangst Group, top 4 577,5 mBåt Group, top 4 709,0 mBåt GpFormationsNaust Formation, top 381,0 mNaust FmKai Formation, top 1 495,0 mKai FmBrygge Formation, top 1 905,0 mBrygge FmTare Formation, top 2 132,0 mTang Formation, top 2 205,0 mSpringar Formation, top 2 255,0 mNise Formation, top 2 385,0 mNise FmKvitnos Formation, top 2 620,0 mKvitnos FmLysing Formation, top 3 336,0 mLange Formation, top 3 464,5 mLange FmNo Formal Name, top 4 152,5 mNo Formal NameLange Formation, top 4 315,0 mLange FmLyr Formation, top 4 549,0 mSpekk Formation, top 4 575,5 mGarn Formation, top 4 577,5 mNot Formation, top 4 637,0 mIle Formation, top 4 660,5 mRor Formation, top 4 709,0 mTofte Formation, top 4 752,0 mRor Formation, top 4 817,5 mTilje Formation, top 4 821,0 mÅre Formation, top 4 927,0 m3811 0002 0003 0004 0004 978

Temperature

Reported at total depth175 °C
Drill-stem test at 4 818,0 m161 °C

2 released wells in Morvin report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6506/11-U-21,2403,0--2007
6506/11-B-3 H1,45 934,0--2009
6506/11-U-11,4390,0--2007
6506/11-A-3 H3,54 752,0--2009
6506/11-A-4 H3,55 620,0--2010
6506/11-A-2 H3,56 351,0--2010
6506/11-A-1 H3,55 962,0--2009
6506/11-85,54 990,0178 °C1,862006

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"440,036"444,0-
Surface casing20"1 387,026"1 390,01,77 LOT
Intermediate13 3/8"2 700,017 1/2"2 710,01,92 LOT
Intermediate9 7/8"4 312,012 1/4"4 313,02,12 LOT
Liner7"4 970,08 1/2"4 970,0-

Mud weight

13 measurements, one dot each, 1,00 to 1,97 g/cm³ against measured depth, bentonite/fw, glydril mc, versapro.

1,01,21,41,61,82,001 0002 0003 0004 000653,0 m: 1,03 g/cm³, BENTONITE/FW1 212,0 m: 1,03 g/cm³, BENTONITE/FW1 373,0 m: 1,03 g/cm³, BENTONITE/FW1 398,0 m: 1,20 g/cm³, BENTONITE/FW1 402,0 m: 1,39 g/cm³, GLYDRIL MC1 762,0 m: 1,50 g/cm³, GLYDRIL MC2 530,0 m: 1,64 g/cm³, GLYDRIL MC3 746,0 m: 1,80 g/cm³, VERSAPRO4 323,0 m: 1,82 g/cm³, VERSAPRO4 580,0 m: 1,92 g/cm³, VERSAPRO4 610,0 m: 1,97 g/cm³, VERSAPRO4 730,0 m: 1,92 g/cm³, VERSAPRO4 972,0 m: 1,92 g/cm³, VERSAPRO

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
34 590,0 - 4 631,03,838,0166240127 000
24 668,0 - 4 700,011,049,0168680253 000
14 751,0 - 4 818,012,0-161--
Show on the mapOpen on FactPages ↗