Fields / Morvin / 6506/11-A-3 H
6506/11-A-3 H
Development, productionJunked
Drilled by Statoil Petroleum AS with Transocean Leader in Morvin, 27.11.2009 to 17.02.2010 (82 days), to 4 752,0 m.
Water depth350,0 m
Total depth4 752,0 m MD
Vertical depth4 469,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,5 m
Formation at total depth-
RigTransocean Leader
Spud27.11.2009
Completed17.02.2010
OperatorStatoil Petroleum AS
Position65,1374 N, 6,4778 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Morvin report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6506/11-A-2 H | 0,0 | 6 351,0 | - | - | 2010 |
| 6506/11-A-1 H | 0,0 | 5 962,0 | - | - | 2009 |
| 6506/11-A-4 H | 0,0 | 5 620,0 | - | - | 2010 |
| 6506/11-8 | 2,4 | 4 990,0 | 178 °C | 1,86 | 2006 |
| 6506/11-U-2 | 2,4 | 403,0 | - | - | 2007 |
| 6506/11-U-1 | 3,0 | 390,0 | - | - | 2007 |
| 6506/11-B-3 H | 3,0 | 5 934,0 | - | - | 2009 |
| 6506/11-7 | 3,5 | 4 977,5 | 175 °C | 1,97 | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.