WellplannerNorwegian shelf well data

Fields / Åsgard / 6506/12-10 A

6506/12-10 A

Exploration, appraisalPlugged and abandonedOil and gas

Drilled by Den norske stats oljeselskap a.s with Ross Rig (2) in Åsgard, 27.06.1995 to 11.12.1995 (167 days), to 6 260,0 m in the Åre Formation.

Water depth285,0 m
Total depth6 260,0 m MD
Vertical depth5 361,0 m TVD
Bottom-hole temperature189 °C
Max inclination57,7°
Rotary table24,0 m
Formation at total depthÅre Formation
RigRoss Rig (2)
Spud27.06.1995
Completed11.12.1995
OperatorDen norske stats oljeselskap a.s
Position65,1355 N, 6,8185 E

Formations

28 tops reported, measured depth in metres.

GroupsNordland Group, top 309,0 mNordland GpHordaland Group, top 1 914,0 mHordaland GpRogaland Group, top 2 227,0 mShetland Group, top 2 384,0 mShetland GpCromer Knoll Group, top 3 457,0 mCromer Knoll GpViking Group, top 4 901,0 mViking GpFangst Group, top 5 245,8 mBåt Group, top 5 416,1 mBåt GpFormationsKai Formation, top 1 452,0 mKai FmBrygge Formation, top 1 914,0 mBrygge FmTare Formation, top 2 227,0 mTang Formation, top 2 315,0 mSpringar Formation, top 2 384,0 mNise Formation, top 2 555,0 mNise FmKvitnos Formation, top 2 848,0 mKvitnos FmLysing Formation, top 3 457,0 mLange Formation, top 3 579,5 mLange FmLyr Formation, top 4 833,0 mSpekk Formation, top 4 901,0 mMelke Formation, top 4 966,0 mMelke FmGarn Formation, top 5 245,8 mNot Formation, top 5 305,0 mIle Formation, top 5 338,3 mRor Formation, top 5 416,1 mTofte Formation, top 5 468,0 mRor Formation, top 5 524,2 mTilje Formation, top 5 552,0 mÅre Formation, top 5 711,0 mÅre Fm3091 0002 0003 0004 0005 0006 0006 260

Temperature

Reported at total depth189 °C
Drill-stem test at 5 686,0 m165 °C
Åsgard gradient36,0 °C/km
Estimated at total depth from the gradient186 °C

The gradient is the median of 21 released wells in Åsgard with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6506/12-10 same well0,05 097,0160 °C1,671995
6506/12-L-4 H1,75 260,0--1999
6506/12-L-3 H1,75 092,0--1998
6506/12-L-2 AH1,75 811,0--1999
6506/12-L-2 H1,75 005,0--1997
6506/12-L-1 H1,76 710,0--1997
6506/12-9 S3,84 910,0166 °C1,751993
6506/12-63,94 741,0167 °C1,701986

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Intermediate9 5/8"5 248,012 1/4"5 250,0-
Liner7"6 260,08 1/2"6 260,01,80 LOT

Mud weight

106 measurements, one dot each, 1,20 to 1,80 g/cm³ against measured depth, oil based.

1,21,41,61,801 0002 0003 0004 0005 0006 0002 810,0 m: 1,80 g/cm³, OIL BASED2 810,0 m: 1,80 g/cm³, OIL BASED2 810,0 m: 1,76 g/cm³, OIL BASED2 810,0 m: 1,74 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,70 g/cm³, OIL BASED2 810,0 m: 1,80 g/cm³, OIL BASED2 810,0 m: 1,80 g/cm³, OIL BASED2 810,0 m: 1,76 g/cm³, OIL BASED2 820,0 m: 1,66 g/cm³, OIL BASED2 820,0 m: 1,70 g/cm³, OIL BASED2 820,0 m: 1,80 g/cm³, OIL BASED2 820,0 m: 1,80 g/cm³, OIL BASED2 859,0 m: 1,66 g/cm³, OIL BASED2 965,0 m: 1,70 g/cm³, OIL BASED3 109,0 m: 1,80 g/cm³, OIL BASED3 221,0 m: 1,80 g/cm³, OIL BASED3 262,0 m: 1,80 g/cm³, OIL BASED3 301,0 m: 1,80 g/cm³, OIL BASED3 362,0 m: 1,80 g/cm³, OIL BASED3 363,0 m: 1,80 g/cm³, OIL BASED3 460,0 m: 1,76 g/cm³, OIL BASED3 465,0 m: 1,76 g/cm³, OIL BASED3 535,0 m: 1,74 g/cm³, OIL BASED3 643,0 m: 1,70 g/cm³, OIL BASED3 730,0 m: 1,70 g/cm³, OIL BASED3 775,0 m: 1,70 g/cm³, OIL BASED3 890,0 m: 1,70 g/cm³, OIL BASED4 099,0 m: 1,70 g/cm³, OIL BASED4 300,0 m: 1,70 g/cm³, OIL BASED4 430,0 m: 1,70 g/cm³, OIL BASED4 457,0 m: 1,70 g/cm³, OIL BASED4 670,0 m: 1,70 g/cm³, OIL BASED4 702,0 m: 1,70 g/cm³, OIL BASED4 900,0 m: 1,75 g/cm³, OIL BASED4 990,0 m: 1,75 g/cm³, OIL BASED4 990,0 m: 1,75 g/cm³, OIL BASED4 990,0 m: 1,75 g/cm³, OIL BASED4 990,0 m: 1,75 g/cm³, OIL BASED4 990,0 m: 1,75 g/cm³, OIL BASED5 041,0 m: 1,77 g/cm³, OIL BASED5 076,0 m: 1,78 g/cm³, OIL BASED5 175,0 m: 1,78 g/cm³, OIL BASED5 245,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,78 g/cm³, OIL BASED5 260,0 m: 1,78 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,20 g/cm³, OIL BASED5 260,0 m: 1,21 g/cm³, OIL BASED5 273,2 m: 1,20 g/cm³, OIL BASED5 273,2 m: 1,20 g/cm³, OIL BASED5 273,2 m: 1,20 g/cm³, OIL BASED5 273,2 m: 1,20 g/cm³, OIL BASED5 273,2 m: 1,20 g/cm³, OIL BASED5 273,2 m: 1,20 g/cm³, OIL BASED5 273,2 m: 1,20 g/cm³, OIL BASED5 273,2 m: 1,20 g/cm³, OIL BASED5 280,0 m: 1,21 g/cm³, OIL BASED5 310,0 m: 1,20 g/cm³, OIL BASED5 345,0 m: 1,20 g/cm³, OIL BASED5 371,0 m: 1,20 g/cm³, OIL BASED5 379,0 m: 1,20 g/cm³, OIL BASED5 380,0 m: 1,20 g/cm³, OIL BASED5 432,0 m: 1,20 g/cm³, OIL BASED5 457,0 m: 1,20 g/cm³, OIL BASED5 499,0 m: 1,20 g/cm³, OIL BASED5 536,0 m: 1,20 g/cm³, OIL BASED5 553,0 m: 1,20 g/cm³, OIL BASED5 613,0 m: 1,20 g/cm³, OIL BASED5 645,0 m: 1,20 g/cm³, OIL BASED5 711,0 m: 1,20 g/cm³, OIL BASED5 737,2 m: 1,20 g/cm³, OIL BASED5 737,2 m: 1,20 g/cm³, OIL BASED5 737,2 m: 1,20 g/cm³, OIL BASED5 737,2 m: 1,20 g/cm³, OIL BASED5 753,0 m: 1,20 g/cm³, OIL BASED5 781,0 m: 1,20 g/cm³, OIL BASED5 846,0 m: 1,20 g/cm³, OIL BASED5 890,0 m: 1,20 g/cm³, OIL BASED5 890,0 m: 1,20 g/cm³, OIL BASED5 890,0 m: 1,20 g/cm³, OIL BASED5 890,0 m: 1,20 g/cm³, OIL BASED5 890,0 m: 1,20 g/cm³, OIL BASED5 893,0 m: 1,20 g/cm³, OIL BASED5 912,0 m: 1,20 g/cm³, OIL BASED5 948,0 m: 1,20 g/cm³, OIL BASED5 959,0 m: 1,20 g/cm³, OIL BASED5 972,2 m: 1,20 g/cm³, OIL BASED

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
15 706,5 - 5 686,019,0-165450168 750
Show on the mapOpen on FactPages ↗