Fields / Halten Øst / 6507/11-WA-1 H
6507/11-WA-1 H
Development, productionProducing
Drilled by Equinor Energy AS with Transocean Spitsbergen in Halten Øst, 30.09.2025 to 06.11.2025 (37 days), to 3 654,0 m.
Water depth294,4 m
Total depth3 654,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depth-
RigTransocean Spitsbergen
Spud30.09.2025
Completed06.11.2025
OperatorEquinor Energy AS
Position65,0200 N, 7,3813 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Halten Øst gradient | 38,5 °C/km |
| Estimated at total depth from the gradient | 132 °C |
The gradient is the median of 6 released wells in Halten Øst with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/11-U-3 | 0,0 | 546,0 | - | - | 2024 |
| 6507/11-6 | 1,6 | 3 440,0 | 115 °C | 1,60 | 2001 |
| 6507/11-3 | 6,3 | 3 250,0 | 107 °C | 1,60 | 1985 |
| 6407/2-4 | 7,0 | 3 001,0 | - | 1,64 | 2009 |
| 6407/2-1 | 7,2 | 3 870,0 | 130 °C | 1,36 | 1982 |
| 6507/11-X-1 H | 7,4 | 3 527,0 | - | - | 1999 |
| 6507/11-X-4 AH | 7,4 | 3 942,0 | - | - | 2000 |
| 6507/11-X-4 H | 7,4 | 3 284,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.