WellplannerNorwegian shelf well data

Fields / 6507/2-7 S

6507/2-7 S

Exploration, appraisalPluggedGas

Drilled by Aker BP ASA with Deepsea Nordkapp, 09.06.2024 to 19.09.2024 (102 days), to 5 055,0 m.

Water depth339,8 m
Total depth5 055,0 m MD
Vertical depth5 013,5 m TVD
Bottom-hole temperature182 °C
Max inclination8,0°
Rotary table32,6 m
Formation at total depth-
RigDeepsea Nordkapp
Spud09.06.2024
Completed19.09.2024
OperatorAker BP ASA
Position65,7930 N, 7,5201 E

Formations

25 tops reported, measured depth in metres.

GroupsNordland Group, top 372,0 mNordland GpHordaland Group, top 1 805,0 mRogaland Group, top 1 928,0 mShetland Group, top 2 044,0 mShetland GpCromer Knoll Group, top 2 859,0 mCromer Knoll GpViking Group, top 3 969,0 mViking GpFangst Group, top 4 640,0 mBåt Group, top 4 778,0 mBåt GpFormationsNaust Formation, top 496,0 mNaust FmKai Formation, top 1 400,0 mKai FmBrygge Formation, top 1 805,0 mTare Formation, top 1 928,0 mTang Formation, top 1 979,0 mSpringar Formation, top 2 044,0 mSpringar FmKvitnos Formation, top 2 450,0 mKvitnos FmLysing Formation, top 2 859,0 mLange Formation, top 2 938,0 mLange FmSpekk Formation, top 3 969,0 mMelke Formation, top 4 070,0 mMelke FmGarn Formation, top 4 640,0 mNot Formation, top 4 695,0 mIle Formation, top 4 733,0 mRor Formation, top 4 778,0 mTilje Formation, top 4 832,0 mÅre Formation, top 4 965,0 m3721 0002 0003 0004 0005 0005 055

Temperature

Reported at total depth182 °C
Drill-stem test at 4 906,1 m20 °C

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/2-U-40,0760,0--2024
6507/2-U-22,4938,0--2022
6507/2-62,44 937,0182 °C1,662022
6507/5-18,14 224,0147 °C1,601997
6507/5-J-1 H8,55 105,0--2010
6507/5-J-2 H8,54 138,0--2010
6507/5-J-4 H8,65 500,0--2012
6507/5-J-3 H8,63 852,0--2010

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Surface casing30"438,536"442,8-
Intermediate20"1 298,726"1 306,01,65 FIT
Intermediate13 5/8"2 753,216 1/2"2 759,01,72 FIT
Intermediate9 7/8"4 563,612 1/4"4 575,01,75 FIT
Liner7"5 053,08 1/2"5 055,0-
Liner7"5 139,08 1/2"5 140,0-

Mud weight

13 measurements, one dot each, 1,00 to 1,62 g/cm³ against measured depth, brine, synthetic, water.

1,01,21,41,601 0002 0003 0004 0005 000760,0 m: 1,30 g/cm³, Water1 306,0 m: 1,03 g/cm³, Water2 470,0 m: 1,03 g/cm³, Brine2 759,0 m: 1,47 g/cm³, Synthetic3 793,0 m: 1,60 g/cm³, Synthetic4 054,0 m: 1,61 g/cm³, Synthetic4 575,0 m: 1,62 g/cm³, Synthetic4 635,0 m: 1,59 g/cm³, Synthetic4 845,0 m: 1,61 g/cm³, Synthetic5 031,0 m: 1,62 g/cm³, Synthetic5 055,0 m: 1,36 g/cm³, Brine5 063,0 m: 1,62 g/cm³, Synthetic5 141,0 m: 1,62 g/cm³, Synthetic

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
14 835,2 - 4 906,120,038,420-257 900
Show on the mapOpen on FactPages ↗