WellplannerNorwegian shelf well data

Fields / Skarv / 6507/5-2

6507/5-2

Exploration, appraisalPlugged and abandonedGas and condensate

Drilled by Amoco Norway Oil Company with West Alpha in Skarv, 13.08.1999 to 23.09.1999 (41 days), to 3 897,0 m in the Åre Formation.

Water depth347,0 m
Total depth3 897,0 m MD
Vertical depth3 894,5 m TVD
Bottom-hole temperature128 °C
Max inclination3,4°
Rotary table18,0 m
Formation at total depthÅre Formation
RigWest Alpha
Spud13.08.1999
Completed23.09.1999
OperatorAmoco Norway Oil Company
Position65,7164 N, 7,6386 E

Formations

25 tops reported, measured depth in metres.

GroupsNordland Group, top 365,0 mNordland GpHordaland Group, top 1 831,0 mHordaland GpRogaland Group, top 2 019,0 mShetland Group, top 2 107,0 mShetland GpCromer Knoll Group, top 2 721,0 mCromer Knoll GpViking Group, top 3 222,0 mViking GpFangst Group, top 3 614,0 mBåt Group, top 3 717,0 mBåt GpFormationsNaust Formation, top 365,0 mNaust FmKai Formation, top 1 395,0 mKai FmBrygge Formation, top 1 831,0 mBrygge FmTare Formation, top 2 019,0 mTang Formation, top 2 073,5 mNise Formation, top 2 107,0 mNise FmKvitnos Formation, top 2 530,0 mKvitnos FmLange Formation, top 2 721,0 mLange FmLyr Formation, top 3 207,0 mSpekk Formation, top 3 222,0 mMelke Formation, top 3 250,0 mMelke FmGarn Formation, top 3 614,0 mNot Formation, top 3 668,5 mIle Formation, top 3 696,0 mRor Formation, top 3 717,0 mTilje Formation, top 3 771,5 mÅre Formation, top 3 854,5 m3651 0002 0003 0003 897

Temperature

Reported at total depth128 °C
Skarv gradient37,2 °C/km
Estimated at total depth from the gradient135 °C

The gradient is the median of 10 released wells in Skarv with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/5-U-12,51 130,0--2010
6507/5-J-4 H2,55 500,0--2012
6507/5-J-3 H2,53 852,0--2010
6507/5-J-1 H2,55 105,0--2010
6507/5-J-2 H2,54 138,0--2010
6507/5-52,53 948,0155 °C1,632001
6507/5-B-8 H2,54 695,0--2011
6507/5-B-7 AH2,55 439,0--2021

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"450,036"450,0-
Surface casing20"1 053,026"1 054,01,45 LOT
Intermediate13 3/8"1 968,017 1/2"1 970,01,81 LOT
Intermediate9 5/8"3 602,012 1/4"3 603,0-
Open hole-3 897,08 1/2"3 897,0-

Mud weight

9 measurements, one dot each, 1,00 to 1,61 g/cm³ against measured depth, barasilc, enviromul, seawater.

1,01,21,41,601 0002 0003 000407,0 m: 1,08 g/cm³, SEAWATER1 050,0 m: 1,36 g/cm³, BARASILC1 662,0 m: 1,39 g/cm³, BARASILC1 914,0 m: 1,50 g/cm³, BARASILC1 964,0 m: 1,50 g/cm³, BARASILC2 518,0 m: 1,61 g/cm³, ENVIROMUL3 142,0 m: 1,61 g/cm³, ENVIROMUL3 329,0 m: 1,61 g/cm³, ENVIROMUL3 623,0 m: 1,61 g/cm³, ENVIROMUL
Show on the mapOpen on FactPages ↗