6507/5-3
Exploration, wildcatPlugged and abandonedGas
Drilled by BP Amoco Norge AS with West Navion in Skarv, 15.05.2000 to 23.06.2000 (39 days), to 3 000,0 m in the Lange Formation.
Water depth417,0 m
Total depth3 000,0 m MD
Vertical depth3 000,0 m TVD
Bottom-hole temperature110 °C
Max inclination1,2°
Rotary table36,0 m
Formation at total depthLange Formation
RigWest Navion
Spud15.05.2000
Completed23.06.2000
OperatorBP Amoco Norge AS
Position65,5891 N, 7,4103 E
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 110 °C |
| Skarv gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 99 °C |
The gradient is the median of 10 released wells in Skarv with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/5-M-1 AH | 0,9 | 3 674,0 | - | - | 2019 |
| 6507/5-M-1 H | 0,9 | 3 553,0 | - | - | 2019 |
| 6507/5-L-1 H | 5,6 | 3 611,0 | - | - | 2020 |
| 6507/5-10 S | 8,2 | 2 214,0 | 74 °C | 1,50 | 2020 |
| 6507/5-11 | 9,0 | 2 306,0 | 74 °C | 1,49 | 2022 |
| 6507/5-7 | 9,2 | 1 598,0 | - | - | 2014 |
| 6507/5-12 S | 9,2 | 2 200,0 | - | - | 2025 |
| 6507/4-U-3 | 9,3 | 812,0 | - | - | 2023 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 536,0 | 36" | 539,0 | - |
| Surface casing | 20" | 688,0 | 26" | 695,0 | 1,32 LOT |
| Intermediate | 13 3/8" | 1 670,0 | 17 1/2" | 1 670,0 | 1,68 LOT |
| Open hole | - | 3 000,0 | 12 1/4" | 3 000,0 | - |
Mud weight
12 measurements, one dot each, 1,00 to 1,58 g/cm³ against measured depth, polymer, seawater.