Fields / Heidrun / 6507/7-4
6507/7-4
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Conoco Norway Inc. with Nortrym in Heidrun, 06.11.1985 to 13.01.1986 (68 days), to 2 850,0 m in the Tilje Formation.
Water depth345,0 m
Total depth2 850,0 m MD
Vertical depth2 850,0 m TVD
Bottom-hole temperature98 °C
Max inclination2,8°
Rotary table25,0 m
Formation at total depthTilje Formation
RigNortrym
Spud06.11.1985
Completed13.01.1986
OperatorConoco Norway Inc.
Position65,3199 N, 7,2625 E
Formations
18 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 98 °C |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 98 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6507/7-B-2 H | 0,8 | 3 321,0 | - | - | 1994 |
| 6507/7-B-3 H | 0,8 | 3 825,0 | - | - | 1994 |
| 6507/7-B-4 H | 0,8 | 5 658,0 | - | - | 1999 |
| 6507/7-U-8 | 0,8 | 375,8 | - | - | 1991 |
| 6507/7-B-1 H | 0,8 | 3 328,0 | - | - | 1994 |
| 6507/7-3 | 1,6 | 2 850,0 | 98 °C | 1,39 | 1985 |
| 6507/7-U-6 | 2,6 | 375,5 | - | - | 1987 |
| 6507/7-A-9 | 2,6 | 3 985,0 | - | - | 1996 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 469,5 | 36" | 951,0 | - |
| Surface casing | 20" | 1 021,0 | 26" | 1 030,0 | 1,51 LOT |
| Intermediate | 13 3/8" | 2 371,0 | 17 1/2" | 2 388,0 | 1,79 LOT |
| Intermediate | 9 5/8" | 2 832,0 | 12 1/4" | 2 850,0 | - |
Mud weight
28 measurements, one dot each, 1,00 to 1,43 g/cm³ against measured depth, water based, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 3 | 2 449,0 - 2 465,0 | 60,3 | 25,0 | - | 1 034 | 91 000 |
| 2 | 2 470,0 - 2 477,0 | 35,8 | 26,0 | - | 875 | 732 000 |
| 1 | 2 494,0 - 2 499,0 | 19,1 | 26,0 | - | 646 | 51 000 |