WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/7-B-4 H

6507/7-B-4 H

Development, injectionClosedWater

Drilled by Den norske stats oljeselskap a.s with Scarabeo 6 in Heidrun, 11.04.1999 to 16.06.1999 (66 days), to 5 658,0 m.

Water depth340,5 m
Total depth5 658,0 m MD
Vertical depth2 722,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,2 m
Formation at total depth-
RigScarabeo 6
Spud11.04.1999
Completed16.06.1999
OperatorDen norske stats oljeselskap a.s
Position65,3128 N, 7,2631 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient93 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/7-B-1 H0,03 328,0--1994
6507/7-B-2 H0,03 321,0--1994
6507/7-B-3 H0,03 825,0--1994
6507/7-U-80,0375,8--1991
6507/7-40,82 850,098 °C1,431985
6507/7-31,62 850,098 °C1,391985
6507/7-U-22,2358,0--1985
6507/7-U-62,8375,5--1987

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗