Fields / Heidrun / 6507/7-B-4 H
6507/7-B-4 H
Development, injectionClosedWater
Drilled by Den norske stats oljeselskap a.s with Scarabeo 6 in Heidrun, 11.04.1999 to 16.06.1999 (66 days), to 5 658,0 m.
Water depth340,5 m
Total depth5 658,0 m MD
Vertical depth2 722,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,2 m
Formation at total depth-
RigScarabeo 6
Spud11.04.1999
Completed16.06.1999
OperatorDen norske stats oljeselskap a.s
Position65,3128 N, 7,2631 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 93 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-B-1 H | 0,0 | 3 328,0 | - | - | 1994 |
| 6507/7-B-2 H | 0,0 | 3 321,0 | - | - | 1994 |
| 6507/7-B-3 H | 0,0 | 3 825,0 | - | - | 1994 |
| 6507/7-U-8 | 0,0 | 375,8 | - | - | 1991 |
| 6507/7-4 | 0,8 | 2 850,0 | 98 °C | 1,43 | 1985 |
| 6507/7-3 | 1,6 | 2 850,0 | 98 °C | 1,39 | 1985 |
| 6507/7-U-2 | 2,2 | 358,0 | - | - | 1985 |
| 6507/7-U-6 | 2,8 | 375,5 | - | - | 1987 |
Casing and formation tests
No casing programme is reported for this wellbore.