Fields / 6507/8-U-3
6507/8-U-3
Other, shallow gasPlugged
Drilled by Neptune Energy Norge AS with West Phoenix, 21.03.2020 to 27.03.2020 (6 days), to 1 150,0 m.
Water depth323,0 m
Total depth1 150,0 m MD
Vertical depth1 150,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table38,6 m
Formation at total depth-
RigWest Phoenix
Spud21.03.2020
Completed27.03.2020
OperatorNeptune Energy Norge AS
Position65,3030 N, 7,5202 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/8-10 S | 0,0 | 2 399,0 | - | - | 2020 |
| 6507/8-U-1 | 5,0 | 587,0 | - | - | 2011 |
| 6507/8-8 | 5,1 | 2 554,0 | - | 1,49 | 2011 |
| 6507/8-2 | 5,5 | 2 690,0 | 76 °C | 1,45 | 1987 |
| 6507/8-5 | 7,0 | 2 000,0 | 65 °C | 1,27 | 1991 |
| 6507/11-11 | 7,3 | 2 900,0 | - | 1,47 | 2015 |
| 6507/8-7 | 7,4 | 2 975,0 | 107 °C | 1,41 | 2004 |
| 6507/8-1 | 8,0 | 2 600,0 | 86 °C | 1,35 | 1986 |
Casing and formation tests
No casing programme is reported for this wellbore.