Fields / Skuld / 6608/10-S-1 AH
6608/10-S-1 AH
Development, injectionClosedWater
Drilled by Equinor Energy AS with Transocean Encourage in Skuld, 27.09.2021 to 06.10.2021 (9 days), to 3 748,0 m.
Water depth343,0 m
Total depth3 748,0 m MD
Vertical depth2 941,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,2 m
Formation at total depth-
RigTransocean Encourage
Spud27.09.2021
Completed06.10.2021
OperatorEquinor Energy AS
Position66,2346 N, 8,3331 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Skuld report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6608/10-S-1 H same well | 0,0 | 3 920,0 | - | - | 2013 |
| 6608/10-S-4 AH | 0,0 | 4 023,0 | - | - | 2014 |
| 6608/10-S-4 H | 0,0 | 3 779,0 | - | - | 2013 |
| 6608/10-S-2 AH | 0,0 | 4 166,0 | - | - | 2013 |
| 6608/10-S-2 H | 0,0 | 3 676,0 | - | - | 2013 |
| 6608/10-S-3 H | 0,0 | 3 274,0 | - | - | 2016 |
| 6608/10-12 | 1,1 | 3 180,0 | 104 °C | 1,51 | 2008 |
| 6608/10-12 A | 1,1 | 3 075,0 | - | 1,45 | 2008 |
Casing and formation tests
No casing programme is reported for this wellbore.