Fields / 7/1-3
7/1-3
Exploration, wildcatJunked
Drilled by Vår Energi ASA with COSLPioneer, 23.01.2025 to 27.01.2025 (4 days), to 165,6 m.
Water depth81,0 m
Total depth165,6 m MD
Vertical depth165,7 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,1 m
Formation at total depth-
RigCOSLPioneer
Spud23.01.2025
Completed27.01.2025
OperatorVår Energi ASA
Position57,8874 N, 2,2322 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.