Fields / 7/1-4 S
7/1-4 S
Exploration, wildcatPlugged and abandonedDry
Drilled by Vår Energi ASA with COSLPioneer, 30.01.2025 to 27.02.2025 (28 days), to 2 516,0 m in the Hod Formation.
Water depth81,0 m
Total depth2 516,0 m MD
Vertical depth2 512,8 m TVD
Bottom-hole temperature109 °C
Max inclination7,6°
Rotary table25,1 m
Formation at total depthHod Formation
RigCOSLPioneer
Spud30.01.2025
Completed27.02.2025
OperatorVår Energi ASA
Position57,8878 N, 2,2319 E
Formations
12 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 109 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Surface casing | 36" | 165,6 | 42" | 168,1 | - |
| Intermediate | 13 3/8" | 855,1 | 17 1/2" | 861,0 | 1,74 FIT |
| Intermediate | 9 5/8" | 2 258,1 | 12 1/4" | 2 268,3 | 1,91 LOT |
| Open hole | - | 2 516,0 | 8 1/2" | 2 516,0 | - |
Mud weight
10 measurements, one dot each, 1,50 to 1,53 g/cm³ against measured depth, oil base, water base.