7/12-A-13 A
Development, injectionPluggedWater
Drilled by BP Norway Limited U.A. with Ula Dp in Ula, 04.11.1989 to 10.12.1989 (36 days), to 4 469,0 m.
Water depth69,0 m
Total depth4 469,0 m MD
Vertical depth3 655,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud04.11.1989
Completed10.12.1989
OperatorBP Norway Limited U.A.
Position57,1115 N, 2,8473 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 142 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-13 same well | 0,0 | 5 124,0 | - | - | 1989 |
| 7/12-A-13 B same well | 0,0 | 4 985,0 | - | - | 2019 |
| 7/12-A-13 C same well | 0,0 | 6 272,0 | - | - | 2019 |
| 7/12-A-14 | 0,0 | 3 693,0 | - | - | 1992 |
| 7/12-A-14 A | 0,0 | 4 531,0 | - | - | 2001 |
| 7/12-A-7 | 0,0 | 3 904,0 | - | - | 1987 |
| 7/12-A-7 A | 0,0 | 4 088,5 | - | - | 1996 |
| 7/12-A-7 B | 0,0 | 5 852,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.