Fields / 7122/7-U-10
7122/7-U-10
Other, shallow gasPlugged
Drilled by Eni Norge AS with West Hercules, 24.11.2018 to 26.11.2018 (2 days), to 489,0 m.
Water depth379,0 m
Total depth489,0 m MD
Vertical depth489,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigWest Hercules
Spud24.11.2018
Completed26.11.2018
OperatorEni Norge AS
Position71,2923 N, 22,2551 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/7-7 S | 0,1 | 1 330,0 | - | 1,32 | 2018 |
| 7122/7-2 | 1,0 | 1 418,0 | 36 °C | 1,26 | 2001 |
| 7122/7-U-2 | 1,0 | 478,0 | - | - | 2005 |
| 7122/7-B-2 H | 1,3 | 3 280,0 | - | - | 2015 |
| 7122/7-B-3 AH | 1,3 | 4 095,0 | - | - | 2025 |
| 7122/7-B-3 H | 1,3 | 3 400,0 | - | - | 2015 |
| 7122/7-B-1 H | 1,3 | 3 730,0 | - | - | 2015 |
| 7122/7-B-4 Y1H | 1,3 | 2 746,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.