Fields / Johan Castberg / 7220/7-EA-4 Y1H
7220/7-EA-4 Y1H
Development, productionClosed
Drilled by Equinor Energy AS with Transocean Enabler in Johan Castberg, 27.04.2025 to 13.05.2025 (16 days).
Water depth379,1 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,1 m
Formation at total depth-
RigTransocean Enabler
Spud27.04.2025
Completed13.05.2025
OperatorEquinor Energy AS
Position72,4989 N, 20,3123 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Johan Castberg gradient | 37,3 °C/km |
The gradient is the median of 3 released wells in Johan Castberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7220/7-EA-4 Y2H same well | 0,0 | 2 655,0 | - | - | 2025 |
| 7220/7-EA-3 H | 0,0 | 2 845,0 | - | - | 2024 |
| 7220/7-EA-2 H | 0,0 | 2 783,0 | - | - | 2025 |
| 7220/8-U-1 | 1,1 | 955,0 | - | - | 2011 |
| 7220/8-1 | 1,1 | 2 222,0 | - | 1,60 | 2011 |
| 7220/8-DA-2 H | 1,8 | 1 717,0 | - | - | 2021 |
| 7220/8-DA-3 Y1H | 1,8 | 2 711,0 | - | - | 2021 |
| 7220/8-DA-3 Y2H | 1,8 | 2 684,0 | - | - | 2022 |
Casing and formation tests
No casing programme is reported for this wellbore.