Fields / 8/10-2
8/10-2
Exploration, wildcatPlugged and abandonedDry
Drilled by Phillips Petroleum Company Norway with Nortrym, 05.02.1980 to 17.03.1980 (41 days), to 2 997,0 m in the Zechstein Group.
Water depth66,0 m
Total depth2 997,0 m MD
Vertical depth2 997,0 m TVD
Bottom-hole temperature91 °C
Max inclination-
Rotary table25,0 m
Formation at total depthZechstein Group
RigNortrym
Spud05.02.1980
Completed17.03.1980
OperatorPhillips Petroleum Company Norway
Position57,1352 N, 3,3026 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 91 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 8/10-U-3 | 10,6 | 101,0 | - | - | 2008 |
| 8/10-3 | 10,7 | 5 738,0 | 176 °C | 1,97 | 2010 |
| 8/10-U-1 | 10,7 | 102,0 | - | - | 2008 |
| 8/10-U-2 | 10,7 | 107,0 | - | - | 2008 |
| 8/10-U-4 | 13,7 | - | - | - | 2013 |
| 8/10-5 A | 14,2 | 2 662,0 | - | 1,74 | 2014 |
| 8/10-5 S | 14,2 | 2 925,0 | 118 °C | 1,59 | 2014 |
| 8/10-1 | 14,3 | 3 089,0 | 101 °C | 1,72 | 1969 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 118,0 | 36" | 118,0 | - |
| Surface casing | 20" | 461,0 | 26" | 478,0 | 1,53 LOT |
| Intermediate | 13 3/8" | 1 198,0 | 17 1/2" | 1 211,0 | 1,90 LOT |
| Intermediate | 9 5/8" | 2 997,0 | 12 1/4" | 2 997,0 | - |
Mud weight
6 measurements, one dot each, 1,00 to 1,36 g/cm³ against measured depth, seawater.