Fields / 8/10-U-3
8/10-U-3
Other, soil drillingPlugged and abandoned
Drilled by Centrica Resources (Norge) AS with Bucentaur, 06.09.2008 to 06.09.2008 (0 days), to 101,0 m.
Water depth67,7 m
Total depth101,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table3,5 m
Formation at total depth-
RigBucentaur
Spud06.09.2008
Completed06.09.2008
OperatorCentrica Resources (Norge) AS
Position57,0401 N, 3,2834 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.