Fields / 8/10-U-4
8/10-U-4
Other, soil drillingPlugged and abandoned
Drilled by Centrica Resources (Norge) AS with Mv Gargano, 07.07.2013 to 08.07.2013 (1 days).
Water depth-
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigMv Gargano
Spud07.07.2013
Completed08.07.2013
OperatorCentrica Resources (Norge) AS
Position57,0643 N, 3,1166 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 8/10-5 A | 0,6 | 2 662,0 | - | 1,74 | 2014 |
| 8/10-5 S | 0,6 | 2 925,0 | 118 °C | 1,59 | 2014 |
| 8/10-U-5 | 3,2 | 420,0 | - | - | 2015 |
| 8/10-B-1 AH | 3,2 | 2 950,0 | - | - | 2022 |
| 8/10-B-1 H | 3,2 | 3 212,0 | - | - | 2018 |
| 8/10-B-2 H | 3,2 | 3 640,0 | - | - | 2018 |
| 8/10-B-3 AH | 3,3 | 2 905,0 | - | - | 2018 |
| 8/10-B-3 BH | 3,3 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.