PL 1182 S
ActiveInitial periodDepth-limited in all or part
Production licence 1182 S was granted 17.02.2023. It is in its initial period and valid to 17.02.2028. Aker BP ASA is the operator, with three licensees in all.
Granted17.02.2023
Valid to17.02.2028
PhaseInitial period
Licensing roundTFO2022
Area granted26 km²
Area now26 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 45 % |
| DNO Norge AS | 40 % |
| Concedo AS | 15 % |
Wellbores drilled in PL 1182 S
3 wellbores, 2 of them exploration, newest first.
| Wellbore | Field | Type | Status | Total depth, m | Spud |
|---|---|---|---|---|---|
| 35/10-U-1 | - | Other | Plugged and abandoned | 1 000,0 | 04.07.2026 |
| 35/10-15 A | - | Exploration | Plugged and abandoned | 3 309,0 | 10.03.2025 |
| 35/10-15 S | - | Exploration | Plugged | 2 105,0 | 26.01.2025 |
Licensees over time
6 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | Aker BP ASA ; DNO Norge AS ; Concedo AS |
| 09.10.2025 | 16.12.2025 | Aker BP ASA ; DNO Norge AS (old) ; Concedo AS |
| 22.07.2024 | 08.10.2025 | DNO Norge AS (old) ; Aker BP ASA ; Concedo AS ; Japex Norge AS |
| 31.01.2024 | 21.07.2024 | DNO Norge AS (old) ; Aker BP ASA ; Concedo AS ; Longboat Japex Norge AS |
| 14.07.2023 | 30.01.2024 | DNO Norge AS (old) ; Aker BP ASA ; Longboat Japex Norge AS |
| 17.02.2023 | 13.07.2023 | DNO Norge AS (old) ; Aker BP ASA ; Longboat Energy Norge AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Aker BP ASA | 01.01.2026 | - |
| DNO Norge AS | 18.12.2025 | 31.12.2025 |
| Sval Energi AS | 17.12.2025 | 17.12.2025 |
| DNO Norge AS (old) | 17.02.2023 | 16.12.2025 |