Seismic / 2017 / ABP17219

ABP17219

4D seabed seismicCompletedNorth Sea

A 4D seabed seismic survey in the North Sea, acquired by Fairfield Nodal for Aker BP ASA. Acquired from 02.04.2017 to 06.05.2017.

Planned start01.04.2017
Planned end15.05.2017
Started02.04.2017
Completed06.05.2017
Boat km planned2 583 km
Boat km done2 583 km
Net area planned, 3D and 4D-
Net area acquired, 3D and 4D-
Company doing the surveyFairfield Nodal
Acquired forAker BP ASA
Responsible companyAker BP ASA
Legal basisPetroleum regulations
SourceSeismic, 2 sources
SensorsSeabed nodes
Offered to the marketNo

Survey area

56,35° N56,13° N3,30 to 3,56° E

The outline spans about 16 km east to west and 24 km north to south. The outline is the net area as reported, simplified to about 200 m.

Vessels

VesselRoleFlagIMO number
Geowave CommanderAcquisition vesselNorway9183867
Ocean PearlAcquisition vesselBahamas9125140

Licences

The licences the survey is acquired under.

PL 006 BPL 033PL 033 B

Weekly progress

From the company's latest weekly report. The register keeps the latest report only, not the weeks before it. Boat km is the distance sailed on line; CDP km is the length of the subsurface lines covered.

100 % of the planned boat km
Boat km in the period2 583 km
CDP km in the period-
Boat km so far4 163 km
CDP km so far-

Notices

15 notices filed for the survey, newest first. The notices' own text is in Norwegian and is on FactPages.

DateNotice
09.05.2017Completion notice
08.05.2017Status changed
03.05.2017Weekly report
25.04.2017Weekly report
18.04.2017Weekly report
11.04.2017Weekly report
10.04.2017Status changed
03.04.2017Start notice
30.03.2017Consultation comment, Institute of Marine Research
15.03.2017Change notice
27.01.2017Status changed
27.01.2017Offshore Directorate letter to the companies
16.01.2017Consultation comment, Institute of Marine Research
06.01.2017Status changed
04.01.2017Consultation comment, Directorate of Fisheries
Open on FactPages ↗