Seismic / 2017
Seismic surveys in 2017
132 surveys in the register for 2017: 42 site surveys, 18 soil surveys, 13 3D seismic surveys, 10 3D electromagnetic surveys, 8 4D seabed seismic surveys, 8 4D seismic surveys and 1 2D seismic survey started. 32 were cancelled.
12D seismic
133D seismic
164D seismic
-km² of 3D and 4D seismic acquired
Every survey
By start date, or the planned start for a survey that did not start. The year is the start year.
| Survey | Status | Type | Area | For company | Started | Completed | Net area, km² |
|---|---|---|---|---|---|---|---|
| ABP17300 | Completed | Site survey | North Sea | Aker BP ASA | 15.03.2017 | 26.03.2017 | - |
| ST17302 | Completed | Site survey | Norwegian Sea | Statoil Petroleum AS | 20.03.2017 | 01.04.2017 | - |
| ST17151 | Completed | Soil survey | North Sea | Statoil Petroleum AS | 23.03.2017 | 09.04.2017 | - |
| OMV17300 | Completed | Site survey | Norwegian Sea | OMV (Norge) AS | 31.03.2017 | 18.04.2017 | - |
| LN17100 | Cancelled | Soil survey | Barents Sea | Lundin Norway AS | - | - | - |
| MCG17001 | Cancelled | 3D seismic | Norwegian Sea | MultiClient Geophysical ASA | - | - | - |
| MCG17002 | Cancelled | 3D seismic | Barents Sea | MultiClient Geophysical ASA | - | - | - |
| POL17001 | Cancelled | 3D seismic | Barents Sea | Polarcus Norway AS | - | - | - |
| TGS17004 | Cancelled | 3D seismic | Norwegian Sea | TGS Nopec Geophysical Company ASA | - | 16.06.2017 | - |
| ABP17219 | Completed | 4D seabed seismic | North Sea | Aker BP ASA | 02.04.2017 | 06.05.2017 | - |
| ST17303 | Completed | Site survey | North Sea | Statoil Petroleum AS | 02.04.2017 | 03.04.2017 | - |
| ABP17302 | Cancelled | Site survey | Barents Sea | Aker BP ASA | - | - | - |
| ST17312 | Completed | Site survey | North Sea | Statoil Petroleum AS | 07.04.2017 | 12.05.2017 | - |
| TGS17003 | Completed | 3D seismic | Norwegian Sea | TGS Nopec Geophysical Company ASA | 08.04.2017 | 13.10.2017 | - |
| ABP17100 | Completed | Soil survey | North Sea | Aker BP ASA | 10.04.2017 | 16.04.2017 | - |
| ABP17303 | Cancelled | Site survey | Barents Sea | Aker BP ASA | - | - | - |
| TGS17001 | Completed | 3D seismic | Norwegian Sea | TGS Nopec Geophysical Company ASA | 12.04.2017 | 22.09.2017 | - |
| ST17304 | Cancelled | Site survey | Barents Sea | Statoil Petroleum AS | - | - | - |
| LN17300 | Completed | Site survey | Barents Sea | Lundin Norway AS | 17.04.2017 | 17.06.2017 | - |
| CP17212 | Completed | 4D seabed seismic | North Sea | ConocoPhillips Skandinavia AS | 22.04.2017 | 05.06.2017 | - |
| PGS17005 | Completed | 3D seismic | Norwegian Sea | Multiklient Invest AS | 24.04.2017 | 23.05.2017 | - |
| SPE17001 | Cancelled | 3D seismic | Norwegian Sea | Spectrum ASA | - | - | - |
| VNG17101 | Completed | Soil survey | Norwegian Sea | VNG Norge AS | 29.04.2017 | 24.05.2017 | - |
| EMG17250 | Completed | 3D electromagnetic | Barents Sea | Electromagnetic Geoservices ASA | 30.04.2017 | 16.05.2017 | - |
| CGG17001 | Cancelled | 3D seismic | North Sea | CGG Services (Norway) AS | - | - | - |
| SPE17002 | Cancelled | 3D seismic | Barents Sea | Spectrum ASA | - | - | - |
| ST17221 | Completed | 4D seabed seismic | North Sea | Statoil Petroleum AS | 01.05.2017 | 20.05.2017 | - |
| ABP17001 | Completed | 4D seismic | North Sea | Aker BP ASA | 03.05.2017 | 12.07.2017 | - |
| WIN17301 | Completed | Site survey | Norwegian Sea | Wintershall Norge AS | 08.05.2017 | 27.05.2017 | - |
| ST17301 | Completed | Site survey | North Sea | Statoil Petroleum AS | 10.05.2017 | 24.05.2017 | - |
| TGS17002 | Completed | 3D seismic | Barents Sea | TGS Nopec Geophysical Company ASA | 15.05.2017 | 24.08.2017 | - |
| EMG17252 | Completed | 3D electromagnetic | Barents Sea | Electromagnetic Geoservices ASA | 17.05.2017 | 07.06.2017 | - |
| ORG17100 | Completed | Soil survey | North Sea | ORG Engineering AS | 18.05.2017 | 29.06.2017 | - |
| WIN17101 | Completed | Soil survey | North Sea | Wintershall Norge AS | 19.05.2017 | 05.06.2017 | - |
| ABP17002 | Completed | 4D seismic | North Sea | Aker BP ASA | 21.05.2017 | 16.07.2017 | - |
| ST17003 | Completed | 4D seismic | North Sea | Statoil Petroleum AS | 21.05.2017 | 22.06.2017 | - |
| PGS17007 | Completed | 3D seismic | Norwegian Sea | Multiklient Invest AS | 22.05.2017 | 13.06.2017 | - |
| ST17211 | Completed | 4D seabed seismic | North Sea | Statoil Petroleum AS | 22.05.2017 | 27.06.2017 | - |
| ST17308 | Completed | Site survey | North Sea | Statoil Petroleum AS | 24.05.2017 | 05.06.2017 | - |
| CE17300 | Completed | Site survey | North Sea | Centrica Resources (Norge) AS | 27.05.2017 | 29.05.2017 | - |
| ABP17102 | Cancelled | Soil survey | North Sea | Aker BP ASA | - | - | - |
| CGG17100 | Cancelled | Soil survey | Barents Sea | CGG Services (Norway) AS | - | - | - |
| TGS17100 | Cancelled | Soil survey | Barents Sea | TGS Nopec Geophysical Company ASA | - | - | - |
| CP17202 | Completed | 4D seabed seismic | North Sea | ConocoPhillips Skandinavia AS | 03.06.2017 | 26.08.2017 | - |
| ST17307 | Completed | Soil survey | Barents Sea | Statoil Petroleum AS | 08.06.2017 | 10.07.2017 | - |
| EMG17251 | Completed | 3D electromagnetic | Barents Sea | Electromagnetic Geoservices ASA | 09.06.2017 | 23.06.2017 | - |
| PGS17009 | Cancelled | 3D seismic | Norwegian Sea | Multiklient Invest AS | - | - | - |
| ST17001 | Completed | 4D seismic | Norwegian Sea | Statoil Petroleum AS | 11.06.2017 | 15.07.2017 | - |
| ABP17101 | Completed | Soil survey | North Sea | Aker BP ASA | 12.06.2017 | 24.07.2017 | - |
| ABP17003 | Completed | 4D seismic | North Sea | Aker BP ASA | 13.06.2017 | 01.07.2017 | - |
| PGS17010 | Completed | 3D seismic | Norwegian Sea | Multiklient Invest AS | 16.06.2017 | 16.07.2017 | - |
| ST17306 | Completed | Site survey | Barents Sea | Statoil Petroleum AS | 16.06.2017 | 03.07.2017 | - |
| ST17320 | Cancelled | Site survey | Barents Sea | Statoil Petroleum AS | - | - | - |
| ORG17101 | Completed | Soil survey | North Sea | ORG Engineering AS | 24.06.2017 | 11.07.2017 | - |
| ST17321 | Cancelled | Site survey | Barents Sea | Statoil Petroleum AS | - | - | - |
| ABP17103 | Completed | Soil survey | North Sea | Aker BP ASA | 25.06.2017 | 28.06.2017 | - |
| ABP17311 | Cancelled | Site survey | Norwegian Sea | Aker BP ASA | - | - | - |
| PGS17003 | Completed | 3D seismic | North Sea | Multiklient Invest AS | 27.06.2017 | 09.09.2017 | - |
| ST17316 | Completed | Site survey | Barents Sea | Statoil Petroleum AS | 27.06.2017 | 28.06.2017 | - |
| ST17325 | Cancelled | Site survey | Norwegian Sea | Statoil Petroleum AS | - | - | - |
| ST17100 | Completed | Soil survey | Barents Sea | Statoil Petroleum AS | 05.07.2017 | 10.07.2017 | - |
| PM17250 | Completed | 3D electromagnetic | Norwegian Sea | Petromarker AS | 08.07.2017 | 23.08.2017 | - |
| ST17311 | Completed | Site survey | North Sea | Statoil Petroleum AS | 10.07.2017 | 26.07.2017 | - |
| ORG17105 | Cancelled | Soil survey | Barents Sea | ORG Engineering AS | - | - | - |
| ORG17106 | Cancelled | Soil survey | Barents Sea | ORG Engineering AS | - | - | - |
| SPE17003 | Completed | 3D seismic | Barents Sea | Spectrum ASA | 12.07.2017 | 11.08.2017 | - |
| LN17001 | Completed | 3D seismic | Barents Sea | Lundin Norway AS | 13.07.2017 | 27.09.2017 | - |
| ORG17102 | Completed | Soil survey | Norwegian Sea | ORG Engineering AS | 13.07.2017 | 25.07.2017 | - |
| ST17328 | Completed | Site survey | Norwegian Sea | Statoil Petroleum AS | 14.07.2017 | 28.07.2017 | - |
| PGS17008 | Cancelled | 3D seismic | Barents Sea | Multiklient Invest AS | - | - | - |
| TGS17005 | Cancelled | 3D seismic | Barents Sea | TGS Nopec Geophysical Company ASA | - | - | - |
| ST17318 | Completed | Site survey | Barents Sea | Statoil Petroleum AS | 16.07.2017 | 06.08.2017 | - |
| ABP17304 | Completed | Site survey | North Sea | Aker BP ASA | 17.07.2017 | 26.07.2017 | - |
| CE17301 | Completed | Soil survey | Barents Sea | Centrica Resources (Norge) AS | 17.07.2017 | 04.08.2017 | - |
| EMG17254 | Completed | 3D electromagnetic | Norwegian Sea | Electromagnetic Geoservices ASA | 17.07.2017 | 02.08.2017 | - |
| ENG17001 | Completed | 4D seismic | North Sea | ENGIE E&P Norge AS | 17.07.2017 | 29.07.2017 | - |
| ST17310 | Completed | Site survey | North Sea | Statoil Petroleum AS | 18.07.2017 | 23.07.2017 | - |
| PGS17011 | Completed | 3D seismic | Barents Sea | Multiklient Invest AS | 21.07.2017 | 21.09.2017 | - |
| SH17001 | Completed | 4D seismic | North Sea | A/S Norske Shell | 21.07.2017 | 04.08.2017 | - |
| ST17314 | Completed | Site survey | Barents Sea | Statoil Petroleum AS | 21.07.2017 | 10.08.2017 | - |
| ABP17004 | Completed | 4D seismic | Norwegian Sea | Aker BP ASA | 22.07.2017 | 02.09.2017 | - |
| ST17330 | Cancelled | Site survey | Norwegian Sea | Statoil Petroleum AS | - | - | - |
| ST17332 | Cancelled | Site survey | Norwegian Sea | Statoil Petroleum AS | - | - | - |
| ABP17301 | Completed | Site survey | North Sea | Aker BP ASA | 27.07.2017 | 09.09.2017 | - |
| ABP17312 | Cancelled | Site survey | North Sea | Aker BP ASA | - | - | - |
| ORG17104 | Completed | Soil survey | Barents Sea | ORG Engineering AS | 27.07.2017 | 06.09.2017 | - |
| ST17327 | Completed | Site survey | North Sea | Statoil Petroleum AS | 27.07.2017 | 24.11.2017 | - |
| ST17329 | Completed | Site survey | Norwegian Sea | Statoil Petroleum AS | 28.07.2017 | 06.08.2017 | - |
| ABP17104 | Cancelled | Soil survey | North Sea | Aker BP ASA | - | - | - |
| EMG17253 | Completed | 3D electromagnetic | Barents Sea | Electromagnetic Geoservices ASA | 03.08.2017 | 22.08.2017 | - |
| ABP17308 | Completed | Site survey | Barents Sea | Aker BP ASA | 07.08.2017 | 22.08.2017 | - |
| ST17331 | Completed | Site survey | Norwegian Sea | Statoil Petroleum AS | 08.08.2017 | 20.08.2017 | - |
| ST17333 | Completed | Site survey | Barents Sea | Statoil Petroleum AS | 11.08.2017 | 30.08.2017 | - |
| PGS17013 | Cancelled | 3D seismic | Barents Sea | Multiklient Invest AS | - | - | - |
| PGS17250 | Completed | 3D electromagnetic | Barents Sea | Multiklient Invest AS | 16.08.2017 | 21.09.2017 | - |
| ST17317 | Completed | Site survey | Norwegian Sea | Statoil Petroleum AS | 21.08.2017 | 26.08.2017 | - |
| ABP17306 | Completed | Site survey | Barents Sea | Aker BP ASA | 22.08.2017 | 24.08.2017 | - |
| EMG17256 | Completed | 3D electromagnetic | Barents Sea | Electromagnetic Geoservices ASA | 23.08.2017 | 15.10.2017 | - |
| NPD17001 | Completed | 2D seismic | Barents Sea | Oljedirektoratet | 23.08.2017 | 18.09.2017 | - |
| TO17100 | Completed | Soil survey | North Sea | Total E&P Norge AS | 23.08.2017 | 06.12.2017 | - |
| BP17200 | Completed | 4D seabed seismic | North Sea | BP Exploration Ltd. | 26.08.2017 | 22.09.2017 | - |
| WIN17001 | Completed | 3D seismic | Barents Sea | Wintershall Norge AS | 26.08.2017 | 21.09.2017 | - |
| ABP17307 | Completed | Site survey | Barents Sea | Aker BP ASA | 27.08.2017 | 30.08.2017 | - |
| ST17326 | Completed | Site survey | North Sea | Statoil Petroleum AS | 30.08.2017 | 09.09.2017 | - |
| EMG17255 | Completed | 3D electromagnetic | Barents Sea | Electromagnetic Geoservices ASA | 01.09.2017 | 28.09.2017 | - |
| ABP17310 | Completed | Site survey | Norwegian Sea | Aker BP ASA | 02.09.2017 | 04.09.2017 | - |
| ST17324 | Completed | Site survey | Barents Sea | Statoil Petroleum AS | 02.09.2017 | 01.10.2017 | - |
| PGS17251 | Completed | 3D electromagnetic | Barents Sea | Multiklient Invest AS | 03.09.2017 | 09.09.2017 | - |
| ABP17305 | Completed | Site survey | Norwegian Sea | Aker BP ASA | 06.09.2017 | 29.09.2017 | - |
| ABP17309 | Completed | Site survey | North Sea | Aker BP ASA | 06.09.2017 | 09.09.2017 | - |
| WP17300 | Completed | Site survey | North Sea | Wellesley Petroleum AS | 06.09.2017 | 25.06.2017 | - |
| ORG17103 | Completed | Soil survey | Norwegian Sea | ORG Engineering AS | 07.09.2017 | 30.09.2017 | - |
| ST17313 | Completed | Site survey | North Sea | Statoil Petroleum AS | 07.09.2017 | 07.09.2017 | - |
| ABP17105 | Cancelled | Soil survey | North Sea | Aker BP ASA | - | - | - |
| TO17300 | Cancelled | Site survey | Norwegian Sea | Total E&P Norge AS | - | - | - |
| ST17154 | Completed | Soil survey | North Sea | Statoil Petroleum AS | 14.09.2017 | 01.10.2017 | - |
| CP17213 | Completed | 4D seabed seismic | North Sea | ConocoPhillips Skandinavia AS | 19.09.2017 | 08.11.2017 | - |
| ST17334 | Cancelled | Site survey | North Sea | Statoil Petroleum AS | - | - | - |
| ST17222 | Completed | 4D seabed seismic | North Sea | Statoil Petroleum AS | 24.09.2017 | 27.10.2017 | - |
| CGG17002 | Completed | 3D seismic | Barents Sea | CGG Services (Norway) AS | 28.09.2017 | 05.10.2017 | - |
| PGS17002 | Completed | 3D seismic | North Sea | Multiklient Invest AS | 28.09.2017 | 27.10.2017 | - |
| WIN17102 | Completed | Soil survey | North Sea | Wintershall Norge AS | 04.10.2017 | 10.10.2017 | - |
| ST17305 | Completed | Site survey | Barents Sea | Statoil Petroleum AS | 08.10.2017 | 18.12.2017 | - |
| ST17309 | Completed | Site survey | North Sea | Statoil Petroleum AS | 08.10.2017 | 27.10.2017 | - |
| EMG17257 | Cancelled | 3D electromagnetic | Norwegian Sea | Electromagnetic Geoservices ASA | - | - | - |
| TO17101 | Completed | Soil survey | North Sea | Total E&P Norge AS | 31.10.2017 | 06.12.2017 | - |
| LN17302 | Completed | Site survey | North Sea | Lundin Norway AS | 08.11.2017 | 13.12.2017 | - |
| MOL17300 | Completed | Site survey | North Sea | MOL Norge AS | 29.11.2017 | 22.12.2017 | - |
| LN17303 | Completed | Site survey | North Sea | Lundin Norway AS | 01.12.2017 | 27.12.2017 | - |
| WP17301 | Completed | Site survey | North Sea | Wellesley Petroleum AS | 02.12.2017 | 31.01.2018 | - |
| MOL17301 | Completed | Site survey | North Sea | MOL Norge AS | 29.12.2017 | 26.01.2018 | - |
| WP17302 | Completed | Site survey | North Sea | Wellesley Petroleum AS | 29.12.2017 | 13.01.2018 | - |