15/5-4
Exploration, appraisalPlugged and abandonedOil shows
Drilled by Norsk Hydro Produksjon AS with Vildkat Explorer in Enoch, 06.06.1991 to 03.07.1991 (27 days), to 2 300,0 m in the Heimdal Formation.
Formations
9 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 63 °C |
| Drill-stem test at 2 136,0 m | 68 °C |
1 released well in Enoch report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/5-2 | 3,0 | 4 322,0 | 127 °C | 1,59 | 1978 |
| 15/5-2 R | 3,0 | 4 322,0 | 127 °C | - | 1979 |
| 15/5-U-1 | 5,2 | 1 070,0 | - | - | 2024 |
| 15/5-C-1 H | 5,3 | 5 514,0 | - | - | 2024 |
| 15/5-C-2 H | 5,3 | 1 082,0 | - | - | - |
| 15/5-8 A | 8,0 | 4 962,0 | - | - | 2025 |
| 15/5-8 S | 8,0 | 4 666,0 | - | - | 2025 |
| 15/5-6 | 8,3 | 2 725,0 | 61 °C | 1,50 | 1997 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 230,0 | 36" | 231,0 | - |
| Intermediate | 13 3/8" | 1 012,0 | 17 1/2" | 1 027,0 | 1,35 LOT |
| Intermediate | 9 5/8" | 2 248,0 | 12 1/4" | 2 300,0 | - |
Mud weight
15 measurements, one dot each, 1,00 to 1,26 g/cm³ against measured depth, water based.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 1 | 2 124,0 - 2 136,0 | 25,4 | - | 68 | - | - |