Drilled by Norsk Hydro Produksjon AS with Treasure Seeker in Eirin, 16.08.1978 to 16.12.1978 (122 days), to 4 322,0 m in the Hegre Group.
Water depth121,0 m
Total depth4 322,0 m MD
Vertical depth-
Bottom-hole temperature127 °C
Max inclination5,8°
Rotary table25,0 m
Formation at total depthHegre Group
RigTreasure Seeker
Spud16.08.1978
Completed16.12.1978
OperatorNorsk Hydro Produksjon AS
Position58,6435 N, 1,6046 E
Formations
26 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 127 °C |
2 released wells in Eirin report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/5-2 R same well | 0,0 | 4 322,0 | 127 °C | - | 1979 |
| 15/5-U-1 | 2,2 | 1 070,0 | - | - | 2024 |
| 15/5-C-1 H | 2,2 | 5 514,0 | - | - | 2024 |
| 15/5-C-2 H | 2,2 | 1 082,0 | - | - | - |
| 15/5-4 | 3,0 | 2 300,0 | 63 °C | 1,26 | 1991 |
| 15/5-6 | 6,4 | 2 725,0 | 61 °C | 1,50 | 1997 |
| 15/6-A-6 Y1H | 6,9 | 4 513,0 | - | - | 2004 |
| 15/6-A-6 Y2H | 6,9 | 4 520,0 | - | - | 2004 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 194,0 | 36" | 194,5 | - |
| Surface casing | 20" | 454,0 | 26" | 469,0 | - |
| Intermediate | 13 3/8" | 1 598,0 | 17 1/2" | 1 615,0 | - |
| Intermediate | 9 5/8" | 3 696,0 | 12 1/4" | 3 714,0 | - |
| Liner | 7" | 4 300,0 | 8 1/2" | 4 322,0 | - |
Mud weight
6 measurements, one dot each, 1,10 to 1,59 g/cm³ against measured depth, waterbased.