15/5-2 R
Exploration, appraisalPlugged and abandonedGas
Drilled by Norsk Hydro Produksjon AS with Treasure Seeker in Eirin, 02.11.1979 to 07.12.1979 (35 days), to 4 322,0 m in the Hegre Group.
Water depth121,0 m
Total depth4 322,0 m MD
Vertical depth-
Bottom-hole temperature127 °C
Max inclination5,8°
Rotary table25,0 m
Formation at total depthHegre Group
RigTreasure Seeker
Spud02.11.1979
Completed07.12.1979
OperatorNorsk Hydro Produksjon AS
Position58,6435 N, 1,6046 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | 127 °C |
2 released wells in Eirin report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/5-2 same well | 0,0 | 4 322,0 | 127 °C | 1,59 | 1978 |
| 15/5-U-1 | 2,2 | 1 070,0 | - | - | 2024 |
| 15/5-C-1 H | 2,2 | 5 514,0 | - | - | 2024 |
| 15/5-C-2 H | 2,2 | 1 082,0 | - | - | - |
| 15/5-4 | 3,0 | 2 300,0 | 63 °C | 1,26 | 1991 |
| 15/5-6 | 6,4 | 2 725,0 | 61 °C | 1,50 | 1997 |
| 15/6-A-6 Y1H | 6,9 | 4 513,0 | - | - | 2004 |
| 15/6-A-6 Y2H | 6,9 | 4 520,0 | - | - | 2004 |
Casing and formation tests
No casing programme is reported for this wellbore.