Fields / 15/5-U-1
15/5-U-1
Other, shallow gasPlugged
Drilled by Equinor Energy AS with COSLPromoter, 24.08.2024 to 26.08.2024 (2 days), to 1 070,0 m.
Water depth119,0 m
Total depth1 070,0 m MD
Vertical depth1 070,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,1 m
Formation at total depth-
RigCOSLPromoter
Spud24.08.2024
Completed26.08.2024
OperatorEquinor Energy AS
Position58,6462 N, 1,6420 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/5-C-2 H | 0,1 | 1 082,0 | - | - | - |
| 15/5-C-1 H | 0,1 | 5 514,0 | - | - | 2024 |
| 15/5-2 | 2,2 | 4 322,0 | 127 °C | 1,59 | 1978 |
| 15/5-2 R | 2,2 | 4 322,0 | 127 °C | - | 1979 |
| 15/6-U-4 | 5,1 | 1 130,0 | - | - | 2019 |
| 15/6-16 S | 5,1 | 4 203,0 | - | 1,85 | 2019 |
| 15/5-4 | 5,2 | 2 300,0 | 63 °C | 1,26 | 1991 |
| 15/5-6 | 5,6 | 2 725,0 | 61 °C | 1,50 | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.