Fields / 2/1-U-5
2/1-U-5
Other, soil drillingPlugged and abandoned
Drilled by BP Petroleum Dev. of Norway AS with Bucentaur, 14.04.1987 to 15.04.1987 (1 days), to 62,0 m.
Water depth67,1 m
Total depth62,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud14.04.1987
Completed15.04.1987
OperatorBP Petroleum Dev. of Norway AS
Position56,8967 N, 3,0844 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.