WellplannerNorwegian shelf well data

Fields / Hod / 2/11-3 A

2/11-3 A

Exploration, appraisalPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Dyvi Beta in Hod, 03.12.1977 to 13.03.1978 (100 days), to 3 400,0 m in the Hod Formation.

Water depth72,0 m
Total depth3 400,0 m MD
Vertical depth2 857,0 m TVD
Bottom-hole temperature110 °C
Max inclination53,4°
Rotary table36,0 m
Formation at total depthHod Formation
RigDyvi Beta
Spud03.12.1977
Completed13.03.1978
OperatorAmoco Norway Oil Company
Position56,1816 N, 3,4644 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth110 °C
Hod gradient35,4 °C/km
Estimated at total depth from the gradient101 °C

The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-3 same well0,03 052,089 °C1,791977
2/11-B-120,1----
2/11-B-90,15 303,0--2022
2/11-B-9 Y20,14 590,0--2022
2/11-B-60,15 640,0--2021
2/11-B-30,14 777,0--2021
2/11-B-110,1----
2/11-B-80,15 346,0--2021

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Intermediate9 5/8"3 129,012 1/4"3 130,01,88 LOT
Open hole-3 400,08 1/2"3 400,0-

Mud weight

2 measurements, one dot each, 1,70 to 1,79 g/cm³ against measured depth, waterbased.

1,71,801 0002 0003 0002 446,0 m: 1,79 g/cm³, waterbased3 288,0 m: 1,74 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
23 230,0 - 3 236,09,5--51963 429
13 268,0 - 3 280,09,5--8812 743
Show on the mapOpen on FactPages ↗