2/11-A-7 A
Development, productionPlugged and abandonedOil
Drilled by Amoco Norway Oil Company with Mærsk Giant in Hod, 14.06.1994 to 21.06.1994 (7 days), to 3 935,0 m.
Water depth72,0 m
Total depth3 935,0 m MD
Vertical depth2 867,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table47,0 m
Formation at total depth-
RigMærsk Giant
Spud14.06.1994
Completed21.06.1994
OperatorAmoco Norway Oil Company
Position56,1765 N, 3,4602 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hod gradient | 35,4 °C/km |
| Estimated at total depth from the gradient | 101 °C |
The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.