WellplannerNorwegian shelf well data

Fields / Ekofisk / 2/4-K-30 A

2/4-K-30 A

Development, injectionInjectingWater

Drilled by ConocoPhillips Skandinavia AS with Ekofisk K in Ekofisk, 06.10.2009 to 20.12.2009 (75 days), to 3 649,0 m.

Water depth71,0 m
Total depth3 649,0 m MD
Vertical depth3 220,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigEkofisk K
Spud06.10.2009
Completed20.12.2009
OperatorConocoPhillips Skandinavia AS
Position56,5655 N, 3,2061 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Ekofisk gradient38,0 °C/km
Estimated at total depth from the gradient122 °C

The gradient is the median of 6 released wells in Ekofisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/4-K-30 same well0,03 733,5--1987
2/4-K-290,03 817,0--1989
2/4-K-29 A0,04 252,0--2009
2/4-K-200,04 030,7--1987
2/4-K-20 A0,03 981,0--2011
2/4-K-20 AY20,04 340,0--2023
2/4-K-20 AY30,04 489,0--2023
2/4-K-190,04 332,7--1989

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗