2/7-S-27
Development, productionProducingOil and gas
Drilled by ConocoPhillips Skandinavia AS with West Elara in Eldfisk, 02.03.2021 to 28.03.2021 (26 days), to 4 433,0 m.
Water depth72,4 m
Total depth4 433,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table81,3 m
Formation at total depth-
RigWest Elara
Spud02.03.2021
Completed28.03.2021
OperatorConocoPhillips Skandinavia AS
Position56,3735 N, 3,2629 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 149 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-32 | 0,0 | 4 673,0 | - | - | 2021 |
| 2/7-S-26 | 0,0 | 6 248,0 | - | - | 2016 |
| 2/7-S-26 A | 0,0 | 6 235,0 | - | - | 2021 |
| 2/7-S-28 | 0,0 | 5 449,0 | - | - | 2021 |
| 2/7-S-28 Y2 | 0,0 | 6 393,0 | - | - | 2021 |
| 2/7-S-22 | 0,0 | 4 846,0 | - | - | 2020 |
| 2/7-S-31 | 0,0 | 6 324,0 | - | - | 2017 |
| 2/7-S-31 A | 0,0 | 4 214,7 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.