2/7-S-26
Development, productionPluggedOil
Drilled by ConocoPhillips Skandinavia AS with Mærsk Innovator in Eldfisk, 20.02.2016 to 08.11.2016 (262 days), to 6 248,0 m.
Water depth72,4 m
Total depth6 248,0 m MD
Vertical depth3 036,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table52,0 m
Formation at total depth-
RigMærsk Innovator
Spud20.02.2016
Completed08.11.2016
OperatorConocoPhillips Skandinavia AS
Position56,3736 N, 3,2629 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-26 A same well | 0,0 | 6 235,0 | - | - | 2021 |
| 2/7-S-31 | 0,0 | 6 324,0 | - | - | 2017 |
| 2/7-S-31 A | 0,0 | 4 214,7 | - | - | 2021 |
| 2/7-S-31 B | 0,0 | 5 354,0 | - | - | 2024 |
| 2/7-S-27 | 0,0 | 4 433,0 | - | - | 2021 |
| 2/7-S-21 | 0,0 | 5 513,0 | - | - | 2015 |
| 2/7-S-32 | 0,0 | 4 673,0 | - | - | 2021 |
| 2/7-S-22 | 0,0 | 4 846,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.