2/7-S-31 B
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with Linus in Eldfisk, 21.04.2024 to 16.07.2025 (451 days), to 5 354,0 m.
Water depth72,1 m
Total depth5 354,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table78,8 m
Formation at total depth-
RigLinus
Spud21.04.2024
Completed16.07.2025
OperatorConocoPhillips Skandinavia AS
Position56,3736 N, 3,2628 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 181 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-31 same well | 0,0 | 6 324,0 | - | - | 2017 |
| 2/7-S-31 A same well | 0,0 | 4 214,7 | - | - | 2021 |
| 2/7-S-26 | 0,0 | 6 248,0 | - | - | 2016 |
| 2/7-S-26 A | 0,0 | 6 235,0 | - | - | 2021 |
| 2/7-S-32 | 0,0 | 4 673,0 | - | - | 2021 |
| 2/7-S-36 | 0,0 | 5 891,0 | - | - | 2016 |
| 2/7-S-27 | 0,0 | 4 433,0 | - | - | 2021 |
| 2/7-S-37 | 0,0 | 5 930,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.