2/7-S-37
Development, injectionInjectingWater
Drilled by ConocoPhillips Skandinavia AS with Mærsk Innovator in Eldfisk, 15.11.2017 to 02.01.2018 (48 days), to 5 930,0 m.
Water depth73,0 m
Total depth5 930,0 m MD
Vertical depth3 063,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,6 m
Formation at total depth-
RigMærsk Innovator
Spud15.11.2017
Completed02.01.2018
OperatorConocoPhillips Skandinavia AS
Position56,3735 N, 3,2628 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Eldfisk gradient | 34,0 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 7 released wells in Eldfisk with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/7-S-36 | 0,0 | 5 891,0 | - | - | 2016 |
| 2/7-S-32 | 0,0 | 4 673,0 | - | - | 2021 |
| 2/7-S-38 | 0,0 | 4 969,0 | - | - | 2017 |
| 2/7-S-31 | 0,0 | 6 324,0 | - | - | 2017 |
| 2/7-S-31 A | 0,0 | 4 214,7 | - | - | 2021 |
| 2/7-S-31 B | 0,0 | 5 354,0 | - | - | 2024 |
| 2/7-S-33 | 0,0 | 4 952,0 | - | - | 2018 |
| 2/7-S-27 | 0,0 | 4 433,0 | - | - | 2021 |
Casing and formation tests
No casing programme is reported for this wellbore.